Cannon Hill Shopping Centre Bus Facility – Bus Station Upgrade

Client

Department Transport & Main Roads

Project value

Completion

2021

Location

Cannon Hill, Qld

Sector

TRANSPORT

The existing Cannon Hill bus facility is located within the Cannon Hill Kmart Plaza, approximately 11km east of the Brisbane CBD (Figure 1) and located at the intersection of Creek Road and Wynnum Road intersection. Buses enter the facility via the Creek Road / Pickwick Street intersection, and the facility currently includes six independent sawtooth bus bays, 40m of marked layover area, an airconditioned passenger waiting area, driver facilities and a park ‘n’ ride with capacity for 13 vehicles.

In 2019 the business case for the Cannon Hill Bus Facility (this project) was completed. The business case investigated the upgrading of the existing bus facility to meet accessibility requirements, passenger amenity and bus operational requirements.

The business case confirmed the functional role of the facility within the network and has identified the extent of upgrades required for the station to provide public transport services in line with TransLink strategic planning. The key objectives of this project are to upgrade the existing facility to meet DDA / DSAPT accessibility requirements, improving passenger amenities and bus operational requirements, that is consistent with meeting the Passenger Transport and Infrastructure Investment Program (PTIIP) objectives to deliver Passenger Transport (PT) Infrastructure.

The key objectives of this project are to upgrade the existing facility to meet DDA / DSAPT accessibility requirements, improving passenger amenities and bus operational requirements, that is consistent with meeting the Passenger Transport and Infrastructure Investment Program (PTIIP) objectives to deliver Passenger Transport (PT) infrastructure.

What we delivered

  • Facilitated a half day Risk Workshop
  • 30% Preliminary Design
  • Prepared a Category 3 cost estimate for all proposed work
  • 80% Preliminary Design
  • Prepared a Category 4 P90 Preliminary cost estimate for all proposed work
  • Submitted an interim Basis of Estimate Report
  • 100% Detail Design
  • Prepared a Category 4 P90 Detailed cost estimate for all proposed work
  • Submitted a Final Basis of Estimate Report

Key outcomes

We provided certainty which allowed the project to progress.

Carmichael Coal Mine & Rail Network
DTMR Henri Roberts Drive (in progress)
Blythe River Bridge Strengthening
North Brisbane Bikeway – Chalk Street to Price Street
Captain Cook Highway Smithfield Bypass
Tinaroo Falls Dam Raising
Nullinga Dam Detailed Business Case
Stony Creek & Lindenow Options
Warrego Highway / Mt Crosby Road Interchange Upgrade
Fairbairn Dam
Maturing the Infrastructure Pipeline Program (MIPP)
Land Street Bikeway Underpass Duplication
Morayfield Indoor Sports and Events Centre Expansion
Torbanlea – Pialba Road Floodway Replacements Business Case
Samford Road Options Analysis
Logan Motorway East Bound Drainage Improvements and Pavement Rehabilitation
Gold Coast Tourism Hub Project – Bundall Road Site
Greenbank Transport Corridor
South Burnett Regional Council Systems Review
Cannon Hill Shopping Centre Bus Facility – Bus Station Upgrade
Newell Highway Flood Immunity West Wyalong to Forbes
Mareeba-Dimbulah Road Widening and Roadside Safety Improvements
Calliope River Bridge and Anabranch Bridge: Engineering Analysis and Options Analysis
North Pine Hub Strategic Assessment
Gregory Highway 27B – LN1 Culverts Upgrade Planning (Business Case)
Barwon Heads Road, Black Rock Road and Staceys Road Roundabout
Pacific Highway Upgrade – Woolgoolga to Ballina
Easing Sydney’s Congestion – Pinch Point Program
Burdekin Falls Dam Improvement and Raising
M6 Early Works Construction
Warragamba Dam Expert Witness Report
South Batemans Bay Link Road
Gunns Gully Road Interchange
M1 Princes Motorway Improvements
Circular Quay Precinct Renewal
Wynnum Road Corridor Upgrade
Arrow Energy Dalby – Laydown Yard
MSC Charleville Industrial Estate
BSC Leans Creek Bridge & Richardsons Bridge Repairs
CHRC Springsure Landfill Rehabilitation
CHRC Capella Landfill Rehab & Transfer Station
MRC Whittle Street Drainage Upgrade
TRC South Street & Burton Street Intersection
Seqwater creek & pipe protection works
MRC Warland Street Drainage
MRC Mackay Bus Stop DDA Compliance Program
MRC Juliet Street Pavement Rehabilitation
NDRRA Flood Betterment Works
Retail First Brookside Shopping Centre Embankment Stabilisation & Car park extension
NSC Black Mountain Road Safety Improvements
TRC Toowoomba Waste Transfer Facilities (*3)
Australian Department of Defence – Kokoda Barracks
Australian Department of Defence – Enoggera Barracks
MRC Caping Road Bridge
DTMR Virginia Park ‘n’ Ride Upgrade
BRC Bruce HWY Upgrade & Streetscape, Gin Gin
MRC Milton Street & Archibald Street Intersection Upgrade
WDRC Warrego Highway Upgrade and Streetscape, Miles QLD
MBRC Aurthur Drewett Drive
WDRC Bundi Creek Bridge (in progress)
NSC Noosa Parade Upgrade