Fulton Hogan Grafton Bridge Works

Project Location: Grafton, NSW

Client: Fulton Hogan

Project Value: $210M

Schedule: Late-2016 – 2019

Project Description

The Grafton Bridge project is worth $210 million, and the bridge will be 525m long, relieving congestion and improving road safety for cyclists, pedestrians and motorists. It will be located approximately 70m from the existing bridge and the road network will be upgraded to incorporate it.

Fulton Hogan have been contracted by RMS to build a 525m long bridge that will relieve congestion and improve road safety for cyclists, pedestrians and motorists. The new bridge will be located approximately 70m from the existing bridge over the Clarence River.

A new flood model will be finalised for the Clarence River, and plant and wildlife surveys will also be completed.

Bellwether Contribution

Bellwether have supplied Project Engineer support to this project in a full time capacity.