Arrow Energy Dalby – Laydown Yard

Client

Arrow Energy

Project value

Circa $2M

Completion

2019

Location

Dalby, QLD

Sector

Energy & Resources

This project involved the construction of a ‘Turn Key’ yard and laydown area for Arrow Energy in Dalby, QLD. Arrow Energy required a Principal Contractor to manage the engineering, procurement and construction (EPC) of this project. The work site is classified as a brownfield area near an operating oil and gas site and included moderately complex service relocations including electrical and communications conduits.

What we delivered

As the Principal Contractor, the Bellwether team managed all aspects of this EPC project, including feasibility costing and concept design, statutory approvals, relevant government departments and council applications and liaison and communication with community leaders, community members and council representatives.

The team managed all construction elements of the project including geotechnical investigations and design development, all construction activities and operation and maintenance handover at completion.

As the Principal Contractor, the Bellwether team also successfully managed a number of specialist subcontractors to deliver various aspects of the project.

“This project has added to Bellwether’s long history of successfully delivering design and construct projects within the Darling Downs.”

Key outcomes

Operating in a sensitive oil and gas environment, the Bellwether team proactively communicated with stakeholders and the community to ensure a ‘no surprises’ approach on this project. This ensured the project ran smoothly and was delivered five weeks early. The Bellwether team’s considered approach to construction management also ensured the project was delivered to budget and a safe worksite was maintained at all times.

This project has added to Bellwether’s long history of successfully delivering design and construct projects within the Darling Downs.

Carmichael Coal Mine & Rail Network
DTMR Henri Roberts Drive (in progress)
Maroochydore
Blythe River Bridge Strengthening
North Brisbane Bikeway – Chalk Street to Price Street
Captain Cook Highway Smithfield Bypass
Tinaroo Falls Dam Raising
Nullinga Dam Detailed Business Case
Stony Creek & Lindenow Options
Warrego Highway / Mt Crosby Road Interchange Upgrade
Fairbairn Dam
Maturing the Infrastructure Pipeline Program (MIPP)
Land Street Bikeway Underpass Duplication
Morayfield Indoor Sports and Events Centre Expansion
Torbanlea – Pialba Road Floodway Replacements Business Case
Samford Road Options Analysis
Logan Motorway East Bound Drainage Improvements and Pavement Rehabilitation
Gold Coast Tourism Hub Project – Bundall Road Site
Greenbank Transport Corridor
South Burnett Regional Council Systems Review
Cannon Hill Shopping Centre Bus Facility – Bus Station Upgrade
Newell Highway Flood Immunity West Wyalong to Forbes
Mareeba-Dimbulah Road Widening and Roadside Safety Improvements
Calliope River Bridge and Anabranch Bridge: Engineering Analysis and Options Analysis
North Pine Hub Strategic Assessment
Gregory Highway 27B – LN1 Culverts Upgrade Planning (Business Case)
Barwon Heads Road, Black Rock Road and Staceys Road Roundabout
Miles Head Office
Melbourne Office
Cooma Regional Office
Sydney Office
Nanango Regional Office
Toowoomba Regional Office
Mackay Regional Office
Sunshine Coast Regional Office
Brisbane Office
Pacific Highway Upgrade – Woolgoolga to Ballina
Easing Sydney’s Congestion – Pinch Point Program
Burdekin Falls Dam Improvement and Raising
M6 Early Works Construction
Warragamba Dam Expert Witness Report
South Batemans Bay Link Road
Gunns Gully Road Interchange
M1 Princes Motorway Improvements
Circular Quay Precinct Renewal
Wynnum Road Corridor Upgrade
Arrow Energy Dalby – Laydown Yard
MSC Charleville Industrial Estate
BSC Leans Creek Bridge & Richardsons Bridge Repairs
CHRC Springsure Landfill Rehabilitation
CHRC Capella Landfill Rehab & Transfer Station
MRC Whittle Street Drainage Upgrade
TRC South Street & Burton Street Intersection
Seqwater creek & pipe protection works
MRC Warland Street Drainage
MRC Mackay Bus Stop DDA Compliance Program
MRC Juliet Street Pavement Rehabilitation
NDRRA Flood Betterment Works
Retail First Brookside Shopping Centre Embankment Stabilisation & Car park extension
NSC Black Mountain Road Safety Improvements
TRC Toowoomba Waste Transfer Facilities (*3)
Australian Department of Defence – Kokoda Barracks
Australian Department of Defence – Enoggera Barracks
MRC Caping Road Bridge
DTMR Virginia Park ‘n’ Ride Upgrade
BRC Bruce HWY Upgrade & Streetscape, Gin Gin
MRC Milton Street & Archibald Street Intersection Upgrade
WDRC Warrego Highway Upgrade and Streetscape, Miles QLD
MBRC Aurthur Drewett Drive
WDRC Bundi Creek Bridge (in progress)
NSC Noosa Parade Upgrade