CHRC Springsure Landfill Rehabilitation

Client

Central Highlands Regional Council

Project value

<$1M

Completion

2021

Location

Springsure, QLD

Sector

WASTE

Central Highlands Regional Council required contractors to carry out rehabilitation works at Springsure landfill that complied with Environmental Authority EPPR00677213 (EA) conditions.

The project is located on Dump Road, approximately 2.4km west of Springsure, off the Dawson Developmental Road.

The project work included landfill rehabilitation activities, construction of a new access road and gravel hardstands for Central Highlands Regional Council (CHRC).

This project generally involved the following scope of works:

  • Preliminaries (contract considerations and procurement)
  • Management plans and documentation
  • Site establishment, erosion controls and setup of site facilities
  • Excavation, investigation and reporting of test pits
  • Widening and lengthening of existing sediment ponds
  • Clearing, grubbing and stripping of existing surface
  • Preparation of existing landfill for capping

What we delivered

Scope of works for rehabilitation works included but were not limited to the following:

  • Test pitting.
  • Capped identified areas with at least 500 mm compacted clean earth as per EA condition.
  • Prepared capping layer subgrade by wetting and compaction.
  • Provided survey report of the compacted subgrade landform in 20 m grid.
  • Provided clean earth material for capping which requires testing and approval by the Principal.
  • Installed at least 200 mm of topsoil and green waste mulch for the growth of vegetation.
  • Provided required topsoil and mulch.
  • Provided suitable seedbed and fertilisers for germination.
  • Established vegetation in topsoil to prevent ponding of stormwater and minimise erosion.
  • Widened existing sediment ponds
  • Built 4 m wide approx. 40 m long weather access road
  • Constructed 4 gravel hard stand areas for the storage of concrete, green waste, mulch and scrap material.
  • Provided survey report of the final landform profile in 20 m grid.
“Bellwether were very easy to deal with and communicated well” -Project Manager, Central Highlands Regional Council

Key outcomes

The project was delivered on time with nil non conformances. Access was maintained at all times for this operational site and the works completed allowed CHRC to meet environmental compliance.

This is the second waste management/Landfill Rehabilitation project Central Highlands Regional Council have engaged Bellwether and achieved successful project outcomes.

Carmichael Coal Mine & Rail Network
DTMR Henri Roberts Drive (in progress)
Blythe River Bridge Strengthening
North Brisbane Bikeway – Chalk Street to Price Street
Captain Cook Highway Smithfield Bypass
Tinaroo Falls Dam Raising
Nullinga Dam Detailed Business Case
Stony Creek & Lindenow Options
Warrego Highway / Mt Crosby Road Interchange Upgrade
Fairbairn Dam
Maturing the Infrastructure Pipeline Program (MIPP)
Land Street Bikeway Underpass Duplication
Morayfield Indoor Sports and Events Centre Expansion
Torbanlea – Pialba Road Floodway Replacements Business Case
Samford Road Options Analysis
Logan Motorway East Bound Drainage Improvements and Pavement Rehabilitation
Gold Coast Tourism Hub Project – Bundall Road Site
Greenbank Transport Corridor
South Burnett Regional Council Systems Review
Cannon Hill Shopping Centre Bus Facility – Bus Station Upgrade
Newell Highway Flood Immunity West Wyalong to Forbes
Mareeba-Dimbulah Road Widening and Roadside Safety Improvements
Calliope River Bridge and Anabranch Bridge: Engineering Analysis and Options Analysis
North Pine Hub Strategic Assessment
Gregory Highway 27B – LN1 Culverts Upgrade Planning (Business Case)
Barwon Heads Road, Black Rock Road and Staceys Road Roundabout
Pacific Highway Upgrade – Woolgoolga to Ballina
Easing Sydney’s Congestion – Pinch Point Program
Burdekin Falls Dam Improvement and Raising
M6 Early Works Construction
Warragamba Dam Expert Witness Report
South Batemans Bay Link Road
Gunns Gully Road Interchange
M1 Princes Motorway Improvements
Circular Quay Precinct Renewal
Wynnum Road Corridor Upgrade
Arrow Energy Dalby – Laydown Yard
MSC Charleville Industrial Estate
BSC Leans Creek Bridge & Richardsons Bridge Repairs
CHRC Springsure Landfill Rehabilitation
CHRC Capella Landfill Rehab & Transfer Station
MRC Whittle Street Drainage Upgrade
TRC South Street & Burton Street Intersection
Seqwater creek & pipe protection works
MRC Warland Street Drainage
MRC Mackay Bus Stop DDA Compliance Program
MRC Juliet Street Pavement Rehabilitation
NDRRA Flood Betterment Works
Retail First Brookside Shopping Centre Embankment Stabilisation & Car park extension
NSC Black Mountain Road Safety Improvements
TRC Toowoomba Waste Transfer Facilities (*3)
Australian Department of Defence – Kokoda Barracks
Australian Department of Defence – Enoggera Barracks
MRC Caping Road Bridge
DTMR Virginia Park ‘n’ Ride Upgrade
BRC Bruce HWY Upgrade & Streetscape, Gin Gin
MRC Milton Street & Archibald Street Intersection Upgrade
WDRC Warrego Highway Upgrade and Streetscape, Miles QLD
MBRC Aurthur Drewett Drive
WDRC Bundi Creek Bridge (in progress)
NSC Noosa Parade Upgrade