The North Brisbane Bikeway is a critical cycle corridor for greater Brisbane, ultimately connecting the Brisbane CBD through to Chermside. A Memorandum of Understanding between BCC and TMR was established in 2013 to collaboratively deliver the North Brisbane Bikeway from Bowen Hills to Chermside. TMR is delivering from Bowen Hills to Price Street, Wooloowin.

TMR required a consultant to conduct an independent review of the Contract Documentation for two Transport Infrastructure Contract – Construct Only packages as part of the detailed design of the bikeway to ensure that all commercial and technical risks were adequately addressed.

What we delivered

Bellwether collaborated with the TMR project and design team to review the available project information and proposed contract documentation which included all forms, contract annexures, specification annexures, supplementary specifications and drawings. Potential commercial and technical risks were identified and changes to the contract documentation proposed to mitigate the risk to TMR and Council.

Key outcomes

Bellwether’s comprehensive review of the contract documentation identified several proposed improvements to achieve enhanced value for money outcomes and provide certainty for TMR through reduced variations during the delivery of the works.

Blythe River Bridge Strengthening
North Brisbane Bikeway – Chalk Street to Price Street
Captain Cook Highway Smithfield Bypass
Tinaroo Falls Dam Raising
Nullinga Dam Detailed Business Case
Stony Creek & Lindenow Options
Warrego Highway / Mt Crosby Road Interchange Upgrade
Fairbairn Dam
Maturing the Infrastructure Pipeline Program (MIPP)
Land Street Bikeway Underpass Duplication
Morayfield Indoor Sports and Events Centre Expansion
Torbanlea – Pialba Road Floodway Replacements Business Case
Samford Road Options Analysis
Logan Motorway East Bound Drainage Improvements and Pavement Rehabilitation
Gold Coast Tourism Hub Project – Bundall Road Site
Greenbank Transport Corridor
South Burnett Regional Council Systems Review
Cannon Hill Shopping Centre Bus Facility – Bus Station Upgrade
Newell Highway Flood Immunity West Wyalong to Forbes
Mareeba-Dimbulah Road Widening and Roadside Safety Improvements
Calliope River Bridge and Anabranch Bridge: Engineering Analysis and Options Analysis
North Pine Hub Strategic Assessment
Gregory Highway 27B – LN1 Culverts Upgrade Planning (Business Case)
Barwon Heads Road, Black Rock Road and Staceys Road Roundabout
Juliet Street Pavement Rehabilitation
NDRRA Flood Betterment Works – Merivale Street, Depot & Pidgeon Roads
Mackay Bus Stop DDA Compliance Program
Milton Street & Archibald Street Intersection Upgrade
Warland Street Drainage
Creek & Pipe Protection Works, Sunnybank
South Street & Burton Street Intersection
Whittle Street Drainage Upgrade
Capella Landfill Rehabilitation and Transfer Station Relocation Work
Springsure Landfill Rehabilitation
Leans Creek Bridge & Richardsons Bridge Repairs
Charleville Industrial Estate Stage 2
Caping Road Bridge
Virginia Park N’ Ride Upgrade
Gin Gin Streetscape Stage Two
Black Mountain Road Safety Improvements
Australian Department of Defence – Enoggera Barracks
Arrow Energy Dalby – Laydown Yard Upgrade
Toowoomba Waste Transfer Facilities
Pacific Highway Upgrade – Woolgoolga to Ballina
Easing Sydney’s Congestion – Pinch Point Program
Burdekin Falls Dam Improvement and Raising
M6 Early Works Construction
Warragamba Dam Expert Witness Report
South Batemans Bay Link Road
Gunns Gully Road Interchange
M1 Princes Motorway Improvements
Circular Quay Precinct Renewal
Wynnum Road Corridor Upgrade
Brookside Shopping Centre – Embankment Stabilisation