TRC South Street & Burton Street Intersection

Client

Toowoomba City Council

Project value

$1M

Completion

2021

Location

Toowoomba, Qld

Sector

TRANSPORT

Toowoomba Regional Council (TRC) received funding approval for the installation of traffic signals at the intersection South Street and Burton Street, Toowoomba.

Works included the installation of traffic signals, reconstruction of pedestrian crossing facilities, resurfacing and line marking of the intersection.

This project is one of 64 projects being accelerated to stimulate economic activity across the Toowoomba Region.

TRC required a local contractor to perform the works to TMR specifications which included the installation of traffic signals, reconstruction of pedestrian crossing facilities, resurfacing line marking of the intersection.

Toowoomba Regional Council (TRC) Infrastructure Committee Portfolio Leader Cr Carol Taylor said the upgrade will improve the intersection’s overall safety and operation as well as cater for future traffic demands.

What we delivered

The project included the installation of traffic signals, removing the existing pedestrian crossing, upgrading street lighting, and replacing asphalt and associated line marking.

Work was undertaken at night from Monday to Friday between the hours of 6pm and 6am and Weekend work was also required to minimise disruptions to Harristown State Primary School, Harristown State High School and Concordia Lutheran College.

There were single lane closures in place during work hours with stop/slow controllers to manage traffic flow including school bus access and parents.

Safe pedestrian access for school children, parents & caregivers was maintained throughout project delivery.

“The intersection will be safer for all users including motorists, pedestrians, students, parents and staff from Harristown State Primary School, Harristown State High School and Concordia Lutheran College,” Cr Taylor

Key outcomes

For safety reasons, right-turn movements from Burton Street were previously  prohibited between 7am and 9am and 2pm and 4pm on school days (buses excepted).

Motorists can now make a safe right-hand turn from Burton Street into South Street.

The project was delivered as part of Council’s Pandemic Response Investment Program and substantially funded through the Queensland Government’s School Transport Infrastructure Program.

Carmichael Coal Mine & Rail Network
DTMR Henri Roberts Drive (in progress)
Maroochydore
Blythe River Bridge Strengthening
North Brisbane Bikeway – Chalk Street to Price Street
Captain Cook Highway Smithfield Bypass
Tinaroo Falls Dam Raising
Nullinga Dam Detailed Business Case
Stony Creek & Lindenow Options
Warrego Highway / Mt Crosby Road Interchange Upgrade
Fairbairn Dam
Maturing the Infrastructure Pipeline Program (MIPP)
Land Street Bikeway Underpass Duplication
Morayfield Indoor Sports and Events Centre Expansion
Torbanlea – Pialba Road Floodway Replacements Business Case
Samford Road Options Analysis
Logan Motorway East Bound Drainage Improvements and Pavement Rehabilitation
Gold Coast Tourism Hub Project – Bundall Road Site
Greenbank Transport Corridor
South Burnett Regional Council Systems Review
Cannon Hill Shopping Centre Bus Facility – Bus Station Upgrade
Newell Highway Flood Immunity West Wyalong to Forbes
Mareeba-Dimbulah Road Widening and Roadside Safety Improvements
Calliope River Bridge and Anabranch Bridge: Engineering Analysis and Options Analysis
North Pine Hub Strategic Assessment
Gregory Highway 27B – LN1 Culverts Upgrade Planning (Business Case)
Barwon Heads Road, Black Rock Road and Staceys Road Roundabout
Miles Head Office
Melbourne Office
Cooma Regional Office
Sydney Office
Nanango Regional Office
Toowoomba Regional Office
Mackay Regional Office
Sunshine Coast Regional Office
Brisbane Office
Pacific Highway Upgrade – Woolgoolga to Ballina
Easing Sydney’s Congestion – Pinch Point Program
Burdekin Falls Dam Improvement and Raising
M6 Early Works Construction
Warragamba Dam Expert Witness Report
South Batemans Bay Link Road
Gunns Gully Road Interchange
M1 Princes Motorway Improvements
Circular Quay Precinct Renewal
Wynnum Road Corridor Upgrade
Arrow Energy Dalby – Laydown Yard
MSC Charleville Industrial Estate
BSC Leans Creek Bridge & Richardsons Bridge Repairs
CHRC Springsure Landfill Rehabilitation
CHRC Capella Landfill Rehab & Transfer Station
MRC Whittle Street Drainage Upgrade
TRC South Street & Burton Street Intersection
Seqwater creek & pipe protection works
MRC Warland Street Drainage
MRC Mackay Bus Stop DDA Compliance Program
MRC Juliet Street Pavement Rehabilitation
NDRRA Flood Betterment Works
Retail First Brookside Shopping Centre Embankment Stabilisation & Car park extension
NSC Black Mountain Road Safety Improvements
TRC Toowoomba Waste Transfer Facilities (*3)
Australian Department of Defence – Kokoda Barracks
Australian Department of Defence – Enoggera Barracks
MRC Caping Road Bridge
DTMR Virginia Park ‘n’ Ride Upgrade
BRC Bruce HWY Upgrade & Streetscape, Gin Gin
MRC Milton Street & Archibald Street Intersection Upgrade
WDRC Warrego Highway Upgrade and Streetscape, Miles QLD
MBRC Aurthur Drewett Drive
WDRC Bundi Creek Bridge (in progress)
NSC Noosa Parade Upgrade