WDRC
$3.5m
Q1 23
Wandoan, QLD
Transport
The works include the demolition and replacement of an existing low level 3 span Timber Bridge. The Timber Bridge was replaced with New 2 Span Concrete Structure over Wandoan Creek. The New Bridge consists of pre-cast driven piles, cast in place Headstock, Abutments and Wingwalls, Procurement and installation of Precast Deck units that were Post tensioned, construction of reliving slabs and the installation of Elastometric Bearing Pads. The works required the design and installation of Temporary works Platforms for the Centre Pier Headstock construction and to assist with Beam landing and installation.
The following major works items summarises the scope of work covered by this Specification:
• Clearing and grubbing along road alignment.
• Removal and stockpiling of topsoil.
• Earthworks to subgrade for approach roadworks.
• Construction of gravel pavements and bitumen surfacing.
• Rock protection to batters.
• Supply, delivery and installation of driven precast bridge piles.
• Cast in situ construction of reinforced concrete abutment headstocks.
• Cast in situ construction of reinforced concrete abutment wingwalls.
• Cast in situ construction of reinforced concrete relieving slabs.
• Cast in situ construction of reinforced concrete abutment protection.
• Supply, delivery, installation and post-tensioning of precast deck units.
• Cast in situ construction of concrete kerb.
• Supply and installation of bridge traffic rail.
• Construction of deck wearing surface.
• Supply and installation of guard rail on bridge approaches.
• Linemarking and signage.
In Progress
In Progress